Dubailand: Five Off-Plan Projects Compared

Communities · 16 November 2026 · 5 min read

Dubailand is a large inland district of family communities, golf courses and leisure attractions. The five off-plan projects we currently list there have little in common beyond the district name: they range from a studio at AED 585,000 to a villa from AED 3,990,000. This guide compares them on home type, budget, payment plan and handover date.

Key points

  • Starting prices run from AED 585,000 at Binghatti Skyflame to AED 3,990,000 at Sobha Sanctuary.
  • Four projects are apartments. Sobha Sanctuary is the only villa community, with four to six bedrooms.
  • Listed handovers span three years, from Q4 2027 (Binghatti Skyflame) to Q4 2030 (Sobha Sanctuary).
  • Three projects use a 70/30 payment plan and two use 60/40, which leaves a larger balance due on handover.
  • The five sit in different parts of the district, including Majan, Motor City and DAMAC Hills, so check the exact location as well as the price.

Dubailand in brief

Dubailand is a broad master area along Sheikh Mohammed bin Zayed Road (E311) and Al Ain Road (E66). It takes in many separate communities, each with its own developer, character and price level. Homes include villas, townhouses and apartments.

Daily life is suburban. Communities have their own parks, pools and community centres, and attractions such as Global Village and IMG Worlds of Adventure are nearby. Public transport is limited in much of the district, so most residents rely on a car.

Because the area is so wide, two "Dubailand" projects can be a long drive apart. Visit the site, or at least map it, before you compare.

How the five projects differ

By home type and budget, they fall into three groups:

By handover, the order is Binghatti Skyflame (Q4 2027), Binghatti SkyTerraces (Q2 2028), Belgravia Gardens (Q3 2028), DAMAC District (Q3 2029) and Sobha Sanctuary (Q4 2030). The first four are under construction. Sobha Sanctuary is a new launch.

The entry-level towers: Binghatti Skyflame and Binghatti SkyTerraces

Both are by Binghatti and both use a 70/30 plan.

Binghatti Skyflame is a pair of towers in Majan with 27 and 22 residential floors. It offers studios, one- and two-bedroom apartments and two-bedroom Royal Suites, plus retail. The developer advertises private pools on every level, and completion is stated as 31 December 2027.

Binghatti SkyTerraces is a tower of 40 residential floors in Motor City, with studios to three-bedroom apartments and commercial space. Green terraces break up the facade, and the amenity deck has several pools, a padel court and a jogging track. Our page lists handover for Q2 2028, and estimates range from late 2027 to Q2 2028.

Choose between them on unit mix and location. SkyTerraces adds three-bedroom homes. Skyflame has the lower entry price and the earlier date.

The mid-range communities: Belgravia Gardens and DAMAC District

Belgravia Gardens by Ellington Properties is a four-cluster community. Each cluster has its own pool, and they are arranged around a central clubhouse, a lazy river and mini golf. Homes are one- to four-bedroom apartments and duplexes, released in phases, on a 70/30 plan. Handover is quoted for Q3 2028 on the later phases.

DAMAC District by DAMAC Properties is a mixed-use, live-work quarter in DAMAC Hills. It pairs one- and two-bedroom apartments with office space, connects directly to DAMAC Hills Mall and sits beside Trump International Golf Club. Amenities lean towards wellness and remote work, with outdoor workspaces, padel courts and a gym. Our page lists a size of 627 sq ft, a 60/40 plan and handover in Q3 2029.

Belgravia Gardens offers the wider range of layouts, up to four bedrooms. DAMAC District is the more urban choice, with shops and offices on the doorstep, but it stops at two bedrooms.

The villa option: Sobha Sanctuary

Sobha Sanctuary by Sobha Realty is a master development off Al Ain Road, reported at 37.5 million sq ft and planned for around 20,000 homes. Sales opened with villa enclaves such as The Brooks, The Greens, The Grove and The Willows.

Villas have four to six bedrooms, from AED 3,990,000, on a 60/40 plan. Prices and handover vary by enclave. The Q4 2030 date on our page is a portal-quoted figure, so confirm the date for the specific enclave. Planned features include green belts, lagoons, a clubhouse, sports facilities, and schools and retail.

This is the longest wait of the five and the largest single commitment. It suits families planning several years ahead more than buyers who need a home soon.

Payment plans and what is due at handover

The first number in a plan is the share paid during construction. The second is due on handover. At the starting prices on our pages:

  • Binghatti Skyflame (70/30): AED 409,500 during construction, AED 175,500 on handover.
  • Binghatti SkyTerraces (70/30): AED 542,499 during construction, AED 232,500 on handover.
  • Belgravia Gardens (70/30): AED 910,000 during construction, AED 390,000 on handover.
  • DAMAC District (60/40): AED 868,200 during construction, AED 578,800 on handover.
  • Sobha Sanctuary (60/40): AED 2,394,000 during construction, AED 1,596,000 on handover.

A 60/40 plan lowers the instalments during the build but leaves a bigger final payment. Also budget for the Dubai Land Department registration fee of 4% of the sale value.

How to choose between them

  1. Fix your home type first. Only Sobha Sanctuary offers villas.
  2. Set a ceiling that includes the 4% registration fee and the handover balance.
  3. Match the handover date to your plans. If you need to move in or let the home by 2028, the two Binghatti towers and Belgravia Gardens are the candidates.
  4. Check the exact location and the drive to work and school.
  5. Ask for sizes and floor plans. Most sizes here are on request, and price per square foot is the fairest comparison.

All current listings are in the project search.

Common questions

Which Dubailand project has the lowest starting price?

Binghatti Skyflame, from AED 585,000. That figure reflects the smallest units released, so larger layouts will cost more.

Which is the earliest handover?

Binghatti Skyflame is listed for Q4 2027. Handover dates are developer estimates and can move, so rely on the date in the sale agreement.

Are off-plan payments in Dubai protected?

Law No. 8 of 2007 requires a developer selling off-plan to open a separate escrow account for the project with an agent accredited by the Dubai Land Department. Buyer payments must be paid into it. Confirm the account details before you transfer money.

Do I need a car to live in Dubailand?

In most of the district, yes. Communities are spread out and public transport is limited in many parts. Check the route from the specific project to the places you travel to most.

This guide is general information, not financial or legal advice. Figures are checked against official sources at the time of writing; confirm current fees and rules before you commit.

369 Capital Ventures advisor
Speak to an advisor

Talk it through with an advisor

Tell us what you are looking for. An advisor will reply by email within one business day with prices, availability and payment plans.